The dry months: the summer works check
Outside work goes best in the dry months, and it books up fast. Walk the building in June and list what needs doing before the autumn rain.
How to use this
Do this from the ground. Do not go on a roof or up a ladder to complete it. Photograph anything you tick as a problem, with the date showing.
This is a prompt for whoever looks after the building. It does not replace your landlord or provider procedures, or any statutory check.
Before the paint fails
- No peeling or flaking paint on windows, doors and fascias
- Window sills and door frames firm, not soft or rotten
- Sealant around frames not cracked or missing
- Outside doors opening and closing without sticking
While it is dry
- Gutters and downpipes clear and fixed
- No moss building up on roofs
- No standing water on flat roofs you can see from a window
- No slipped or missing tiles you can see
Paths, fences and green spaces
- Hedges and trees not blocking paths, signs or lights
- Paths and steps free of trip hazards
- Weeds cleared from paving and gutters at ground level
- Fences, gates and bin stores sound
Heat and air
- Windows opening, with restrictors working on upper floors
- Fire doors not wedged open to cool rooms
- Extractor fans working
- Blinds and curtains fixed firmly
Book it in
- Outside jobs listed and booked for the dry weeks
- Empty rooms checked with our void property checklist
- Planned works agreed before autumn
Close the loop
- Date, location and what you found
- A photograph of each problem
- Who it was reported to, and the date it was fixed
- Anything left open from your last check
Send us the list
This is the season for outside work. See plastering and decorating, joinery and carpentry, grounds maintenance and planned maintenance.
Tell us where to start
Ring Wayne Cator, our Managing Director, or send us the details and we will come back to you.